NCDOT Helicopter Landing Area Permit

Each Helicopter Landing Area Proposal be compatible with adjacent public roads and inspected for impact affecting motor vehicle operation and safety on adjoining public roads by completing the required permit. This application is not out on NC's webpages. Use the address below to obtain contact information for the Division of Aviation. Must contact them for information on obtaining permit.

Other Information

Duration of License

Permanent

Authority

GS 136-18(22)

Exam: No Exam
License Type: Stand-Alone License

Fees

Application
$0.00
New License
$0.00
Renewal
$0.00
Reciprocity:
$0.00
Miscellaneous:
$0.00

Other Requirements

U.S. Department of Transportation Federal Aviation Administration Title 14 Code of Federal Regulations Part 157 requires all persons to notify the FAA at least 90 days before construction, alteration, activation, deactivation, or change to the status or use of a civil or joint-use (civil/military) airport, by completing FAA Form 7480-1 through their Web Link for Obstruction Evaluation / Airport Airspace Analysis (OE/AAA): https://oeaaa.faa.gov/oeaaa/external/userMgmt/permissionAction.jsp?action=showLoginForm. This will start an airspace study (takes about 6-12 months). After issuance of the Determination Letter from the FAA, completion is required of the FAA Form 5010-5 (Airport Master Record) and the North Carolina Department of Transportation Aircraft Landing Area Permit form (NCDOT will not except this form without the Determination Letter from the FAA). The local county and/or municipal government should be contacted initially to determine if the proposes airport site is properly zoned.

Licensing Authority

NC Department of Transportation
Aviation (Highways)
Statewide Programs
1050 Meridian Drive
1 South Wilmington Street
Morrisville, NC 27560-
919-814-0550

Please check with your local City, County or Municipality for area specific license requirements they may have.