Required Authorization For Construction Of Wastewater Collection, Treatment And Disposal Systems, Excluding Systems Designed To Discharge Effluent To The Land Surface Or Surface Waters
Valid As Long As Permitted System Is Operating
GS 130A, Section 333 -343
The Operation Permit Is Required Prior To The Facility Receiving Permanent Electrical Service. Technical Assistance From The State Can Be Requested By The Local Health Department. Contractor Would Contact The Local Health Department Before The System Is Covered Up
NC Department of Environmental Quality
Water Resources
217 West Jones Street
Raleigh, NC 27603-
919-707-9000